Building an extension can be a difficult, stressful stage of anyones life. We’ve therefore outlined six tips on how you can get the best results from your builder.

Building an extension can be a difficult, stressful stage of anyones life. We’ve therefore outlined six tips on how you can get the best results from your builder.

We have also compiled an information packed PDF document that highlights the common pitfalls homeowners make when building an extension. If you want to receive a free copy, then send us a message and we will email it across.

  • Insist on a fixed price, rather than one based on day rates. Ask for a thorough breakdown of costs that highlights labour and materials for the project.
  • Sign a contract with your builder. Use the Joint Contract Tribunal’s homeowner or Minor Works contracts, depending on the size of the job. They’re available for £28.40 and £33.40, from www.jctltd.co.uk.
  • Unless you have plenty of time and experience, it may be worth while hiring a project manager to oversee the works. Expect to pay 10% of the total build cost.
  • Always set aside a contingency sum of between 10-15% of the contract sum. Extra changes aren’t necessarily a rip-off – they’re often caused by problems that surface midway.
  • When the works are completed, withhold a retention sum of 2.5% to 5% of the final contract sum. Don’t keep calling your builder about every crack or faulty switch, instead wait a month or two, then get them back to sort out all of the snagging issues in one go.
  • Only pay the final retention sum once EVERYTHING is completed!